Capacity: 73,967 Luxury Boxes: 76 Dugout Suites; 88 boxes at club level. (Dugout Suites added in 1999) Construction Started: 4/4/72 Area Covering: 113 acres Officially Opened: 8/17/73 Field Level: 50 ft. below ground level Cost: $22 million Upper Deck: 60 ft. above ground level Surface: AstroPlay Restrooms: 127 locations Drainage: Subsurface pipes Parking Facilities: 12,000 cars, 300 buses & 250 campers Current Surface Installed: 2003 Stadium Lighting: sideline, 180 ft. candles; mid-field, 300 ft. candles Cost: $1.3 million 1st Regular Season Game: Bills 9, Jets 7 (9/30/73) Largest Crowd: 80,368 vs. Miami, 10/4/92.
SONY JUMBOTRON VIDEOBOARD
One of the largest SONY JumboTrons in the U.S. Construction Started: 6/15/94 Cost: $5.7 Million First Game Utilized: 8/8/94 vs. Washington Size: 31.5 feet by 41.5 feet Light Emitting Elements: 278,784 Number of Operators: 18 video technicians Capabilities: full-color instant replay, live action shots, crowd shots, out-of-town highlights, and various in-stadium shots from cameras exclusive to videoboard usage.
|
|